Opened 12 years ago

Closed 12 years ago

#143 closed help (fixed)

Hector tic code

Reported by: gdevine Owned by: lois
Component: UM Model Keywords:
Cc: Platform:
UM Version:

Description

Hi,

I have been trying to run the sample job on HECToR (xczia (my equivalent = xddsa)). I have followed the instructions on the webpage but get an error as follows:

No time in budget n02

Job terminated on failure of budget access/allocation validation
Could not run prolog: pro/epilogue failed, file: /var/spool/PBS/mom_priv/prologue, exit: 1, nonzero p/e exit status

As far as I am aware I have been setup on the n02 disk - What I am doing wrong here? (The tic code I use is n02)

Thanks,
Gerry

Change History (3)

comment:1 Changed 12 years ago by lois

  • Owner changed from um_support to lois
  • Status changed from new to assigned

Hello Gerry,
since the last NERC HPC meeting on 25th April 2008 when the NCAS allocation for this year was decided NCAS has opted to divide our total budget into differetn sub projects. So far we have 9 subprojects
n02-ncas for all PhD students or other non NERC funded people
n02-weat for all people working under the NCAS weather group
n02-clim for all peolple working within NCAs climate
n02-cms for all the support people
n02-casc for the CASCADE project
n02-qesm for the QUEST/QESM project
n02-sol forthe SOLCLI project
n02-hgem for the UJCC/higem project
n02-bas for the BAS people

I have assigned most users to a particular sub group and there is only one sub group per user. I have yet to assign you so which grouping do you think you should be in? I can assign you very quickly once this decision is made. Then all you have to do for the UM is change your TIC code to the new subproject.

Lois

comment:2 Changed 12 years ago by gdevine

Hi lois,

thanks for the speedy reply. I think that, given the options, n02-casc is closest - I am part contracted to the Cascade project.

Cheers,
Gerry

comment:3 Changed 12 years ago by lois

  • Resolution set to fixed
  • Status changed from assigned to closed

You are now in the n02-casc sub project so when HECToR returns you should be able to run the UM with the TIC code n02-cas.

Lois

Note: See TracTickets for help on using tickets.