Opened 3 months ago

Closed 4 weeks ago

#3438 closed help (completed)

budget for n02-FEBBRAIO

Reported by: pmcguire Owned by: ros
Component: ARCHER Keywords: budget, N216, ARCHER
Cc: Platform: ARCHER
UM Version: 11.5

Description

Hi CMS Helpdesk
I am trying to run two 20.5-year N216 runs on ARCHER during the two-week break for the PORCELAIN project. All was going well, but then I ran out of budget on n02-FEBBRAIO. Can you recharge that? Can you let me know when this recharge is done? Then I can log back in to make sure that the jobs have resumed properly.
Thanks
Patrick McGuire?

Attachments (1)

ARCHER » ARCHER kAU Calculator N216 20.5 year two-jobs.pdf (542.8 KB) - added by pmcguire 2 months ago.

Download all attachments as: .zip

Change History (4)

comment:1 Changed 2 months ago by ros

  • Owner changed from um_support to ros
  • Status changed from new to accepted

Hi Patrick,

I've put some more into FEBBRAIO to hopefully tide over till New Year. If you can give some idea of how much you're going to need that would be helpful.

Cheers,
Ros.

comment:2 Changed 2 months ago by pmcguire

Hi Ros:
Thanks for doing this. The jobs are running again now.

I used the kAU calculator, for two 20.5-year N216 jobs with 1,152 processors, and I attach the PDF for the calculator, which says that it will be 14,500 kAU for each of the two jobs.

A previous job like this was u-bx394, if there is some way to look up how much it actually used.

Patrick

comment:3 Changed 4 weeks ago by ros

  • Resolution set to completed
  • Status changed from accepted to closed
Note: See TracTickets for help on using tickets.