Changes between Version 9 and Version 10 of Archer/Transition2020/PPTransfer


Ignore:
Timestamp:
17/02/20 12:53:51 (6 months ago)
Author:
ros
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Archer/Transition2020/PPTransfer

    v9 v10  
    9494 `ssh login.archer.ac.uk` 
    9595 
     96== Loading the changes into the suite == 
    9697 
     98Instructions differ depending in if you are modifying an already running suite or new suite. 
     99 
     100=== Already running suite === 
     101 * Run `rose suite-run --reload` 
     102 
     103 * Load the build of the `pptransfer` scripts on JASMIN into the suite 
     104 
     105{{{ 
     106cylc insert <SUITEID> fcm_make_pptransfer.<CYCLEPOINT> 
     107cylc insert <SUITEID> fcm_male2_pptransfer.<CYCLEPOINT> 
     108}}} 
     109 
     110where `<SUITEID>`is the name of the suite and `<CYCLEPOINT>` is the name of the cycle to insert into eg. `19890901T000Z` 
     111 
     112You should see 2 new tasks appear in the cylc GUI. 
     113 
     114Right click on `fcm_make_pptransfer` and select '''Trigger Run (now)'''.  Once this has succeed do the same for `fcm_make2_pptransfer`. 
     115 
     116=== New suite === 
     117 
     118Simply start the suite as normal: `rose suite-run`