Changes between Version 11 and Version 12 of Archer/Transition2020/PPTransfer


Ignore:
Timestamp:
17/02/20 13:03:10 (6 months ago)
Author:
ros
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Archer/Transition2020/PPTransfer

    v11 v12  
    9494 `ssh login.archer.ac.uk` 
    9595 
    96 == Loading the changes into the suite == 
    97  
    98 Instructions differ depending in if you are modifying an already running suite or new suite. 
    99  
    100 === Already running suite === 
    101  * Run `rose suite-run --reload` 
    102  
    103  * Load the build of the `pptransfer` scripts on JASMIN into the suite 
    104  
    105 {{{ 
    106 cylc insert <SUITEID> fcm_make_pptransfer.<CYCLEPOINT> 
    107 cylc insert <SUITEID> fcm_male2_pptransfer.<CYCLEPOINT> 
    108 }}} 
    109  
    110 where `<SUITEID>`is the name of the suite and `<CYCLEPOINT>` is the name of the cycle to insert into eg. `19890901T000Z` 
    111  
    112 You should see 2 new tasks appear in the cylc GUI. 
    113  
    114 Right click on `fcm_make_pptransfer` and select '''Trigger Run (now)'''.  Once this has succeed do the same for `fcm_make2_pptransfer`. 
    115  
    116 === New suite === 
    117  
    118 Simply start the suite as normal: `rose suite-run` 
     96=== Updating a Running Suite ===  
     97    1. Reload the suite: `rose suite-run --reload` 
     98    1. Hold the whole suite, or just the next `pptransfer` task  
     99    1. In the Cylc GUI: Control --> Insert Task(s)…  
     100    1. Set TASK-NAME.CYCLE-POINT=fcm_make_pptransfer.<YYYYMMDDT0000Z>, where <YYYYMMDDT0000Z> is an active cycle point  
     101    1. Leave stop-point=POINT blank  
     102    1. Check the "Do not check if a cycle point is valid or not" box  
     103    1. Insert, and wait for the task to complete.  
     104    1. If nothing happens: You probably typed something incorrectly!  Try again.  
     105    1. In the Cylc GUI: Control --> Insert Task(s)…  
     106    1. Set TASK-NAME.CYCLE-POINT=fcm_make2_pptransfer<YYYYMMDDT0000Z>, where <YYYYMMDDT0000Z> is an active cycle point  
     107    1. Leave stop-point=POINT blank  
     108    1. Check the "Do not check if a cycle point is valid or not" box  
     109    1. Insert, and wait for the task to complete.  
     110    1. Release the held suite/pptransfer task