Changes between Version 13 and Version 14 of Docs/Polaris
- Timestamp:
- 19/03/13 16:42:57 (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Docs/Polaris
v13 v14 91 91 92 92 93 The following figure summarizes results from test running the four HadGEM2 jobs with increasing processor count. The jobs were run for 3 model days, with the exception of HadGEM2-CC was run for 1 model day. The results for total wall clock time for HadGEM2-ES running on HECToR and CURIE (a PRACE machine (Bull)) are also shown. Data points in red refer to the compute time for the Polaris jobs. All models display a lack of scaling when run on 96 processors 93 The following figure summarizes results from test running the four HadGEM2 jobs with increasing processor count. The jobs were run for 3 model days, with the exception of HadGEM2-CC was run for 1 model day. The results for total wall clock time for HadGEM2-ES running on HECToR and CURIE (a PRACE machine (Bull)) are also shown. Data points in red refer to the compute time for the Polaris jobs. All models display a lack of scaling when run on 96 processors. 94 94 95 95 [[Image(hg2.png)]]