    33''17 February 2014'' 
    44 
    5 The GO5.0 ORCA 1/4 degree standard job has been ported to HECToR ('''xiyla''') and Archer ('''xiylc''').  
     5The GO5.0 ORCA 1/4 degree standard job has been ported to Archer ('''xiylc''').  
    66 
    77This is a forced spin-up run ('''xhjeh''' on MONSooN and '''amhih''' on the main Met office system).  
     
    1616== Timing runs == #timing 
    1717 
     185 day test runs (320 timesteps) with restart files written at the end of 5 days but no mean diagnostic output.  
    1819 
     20In all cases here NEMO and CICE have the same decomposition.  
     21 
     22{{{ 
     23MONSooN:   8x12     3 nodes    20m  
     24 
     25HECToR:    8x12     3 nodes    1h 16m 
     26           8x16     4 nodes    50m 23s 
     27 
     28Archer:    8x12     4 nodes    23m 3s 
     29}}} 
    1930 