Changes between Version 2 and Version 3 of Projects/IS-ENES2
- Timestamp:
- 31/05/13 13:37:54 (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Projects/IS-ENES2
v2 v3 6 6 The second !InfraStructure for the European Network for Earth System Simulation project (IS-ENES2) begun in May 2013, and will run for four years. It is the continuation of two previous projects: [http://is.enes.org IS-ENES] and [http://metaforclimate.eu Metafor]. 7 7 8 [http://ncas.ac.uk NCAS] is engaged in a number of work packages in IS-ENES2, through CMS, [http://climate.ncas.ac.uk NCAS/Climate] and the [http://badc.nerc.ac.uk NCAS/BADC] (andthe BADC host organisation, the Centre for Environmental Data Archival, [http://ceda.ac.uk CEDA]. This page summarises the CMS and Climate activities.8 [http://ncas.ac.uk NCAS] is engaged in a number of work packages in IS-ENES2, through CMS, [http://climate.ncas.ac.uk NCAS/Climate] and the [http://badc.nerc.ac.uk NCAS/BADC] (via the BADC host organisation, the Centre for Environmental Data Archival, [http://ceda.ac.uk CEDA]. This page summarises the CMS and Climate activities. 9 9 10 10