Changes between Version 3 and Version 4 of Projects/IS-ENES2


Ignore:
Timestamp:
31/05/13 14:02:05 (7 years ago)
Author:
lawrence
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Projects/IS-ENES2

    v3 v4  
    66The second !InfraStructure for the European Network for Earth System Simulation project (IS-ENES2) begun in May 2013, and will run for four years. It is the continuation of two previous projects: [http://is.enes.org IS-ENES] and [http://metaforclimate.eu Metafor]. 
    77 
    8 [http://ncas.ac.uk NCAS] is engaged in a number of work packages in IS-ENES2, through CMS, [http://climate.ncas.ac.uk NCAS/Climate] and the [http://badc.nerc.ac.uk NCAS/BADC] (via the BADC host organisation, the Centre for Environmental Data Archival, [http://ceda.ac.uk CEDA]. This page summarises the CMS and Climate activities. 
     8[http://ncas.ac.uk NCAS] is engaged in a number of work packages in IS-ENES2, through CMS, [http://climate.ncas.ac.uk NCAS/Climate] and the [http://badc.nerc.ac.uk NCAS/BADC] (via the BADC host organisation, the Centre for Environmental Data Archival, [http://ceda.ac.uk CEDA]. The lead investigator in CMS is [http://www.met.reading.ac.uk/users/users/1678 Professor Bryan Lawrence]. This page summarises the CMS and Climate activities. 
     9 
     10The formal engagement is via the following work packages: 
     11 
     12||= '''Id''' =||= '''Effort''' =||= '''Short Description of Work Package''' =||= '''Activities''' =|| 
     13|| NA1 (WP2) || 8 pm || '''ENES Strategy''':  aiming at strengthening the integration of the ENES community. Three main task areas: strengthening the governance of ENES, further develop the ENES strategy, and support community building (including training). CMS is co-leader of this work package with CNRS, and has particular responsibilities for governance and reporting, developing the strategy, and training. || || 
     14|| NA2 (WP3) || 12 pm || '''Model Futures''': The general aim of this work package is to prepare the community for future computing platforms. The CMS engagement in this is three-fold: implementing radiation codes (2014 or later), examining and documenting existing model codes (2013-2014), and organising a workshop on model code comparisons. || || 
     15|| NA5 (WP6) || 2pm  || '''Innovation through collaboration with ICT companies'''. The main role of CMS is in attending workshops aimed at mutual exchange of information between climate modellers and industry to foster the co-design idea in hardware and software development.  || || 
     16|| JRA1 (WP9) || 16 pm || || || 
     17|| JRA3 (WP11) || 21 pm || || || 
    918 
    1019