Changes between Version 74 and Version 75 of Projects


Ignore:
Timestamp:
04/09/17 16:24:11 (2 years ago)
Author:
ros
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Projects

    v74 v75  
    1717|| [wiki:Projects/Porting Porting and optimising the UM] || [wiki:Projects/INSPECT INSPECT] This is a NERC project “Improving simple climate models through process-based analysis of ocean heat uptake in AOGCMs and observations” (T.Kuhlbrodt, R Tailleux, J M Gregory) || 
    1818|| [wiki:Projects/Rose Rose] (2013-) From UM vn9.0 onwards the UMUI will be replaced with Rose || [wiki:Projects/IS-ENES2 IS-ENES2] (2013-17) The second !InfraStructure for the European Network for Earth System Simulation project. Funded for 51 months FTE (2013-17) || 
    19 || [wiki:Projects/UM-NetCDF UM NetCDF] Project working on modifying the UM to write CF-NetCDF output || [wiki:Projects/KPP KPP] Integrating MetUM-GOML into Rose || 
     19|| [wiki:Projects/UM-NetCDF UM NetCDF] Project working on modifying the UM to write CF-NetCDF output || [wiki:Projects/FASCINATE FASCINATE] "Forecasting Air-Sea Coupled Interactions in Numerical weather prediction for Atmospheric Tropical Extremes" || 
    2020||[wiki:Projects/ARCHER-UM-Module-Environment ARCHER UM Module Environment]  Design and implementation of UM modules for ARCHER to facilitate the management of software upgrades || [wiki:Projects/NEMOVAR NEMOVAR] A Rose-based ocean assimilation suite ported from the Met Office to MONSooN || 
    2121|| [wiki:Projects/NCAS-CSS NCAS Climate Summer School 2015] || [wiki:Projects/INCOMPASS INCOMPASS] NERC/MoES project to improve the skill of rainfall prediction in operational weather & climate models ||