Changes between Version 80 and Version 81 of Projects


Ignore:
Timestamp:
23/08/18 14:35:43 (13 months ago)
Author:
ros
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Projects

    v80 v81  
    1616|| [wiki:Projects/HRGW High Resolution Gravity Wave Modelling] || [wiki:Projects/ImpalaParaCon IMPALA and ParaCon] Developing diagnostic capabalities for MONC (Met Office NERC cloud model). || 
    1717|| [wiki:Projects/Porting Porting and optimising the UM] ||  || 
    18 || [wiki:Projects/Rose Rose] (2013-) From UM vn9.0 onwards the UMUI will be replaced with Rose || [wiki:Projects/IS-ENES2 IS-ENES2] (2013-17) The second !InfraStructure for the European Network for Earth System Simulation project. Funded for 51 months FTE (2013-17) || 
     18|| [wiki:Projects/Rose Rose] (2013-) From UM vn9.0 onwards the UMUI will be replaced with Rose || || 
    1919|| [wiki:Projects/UM-NetCDF UM NetCDF] Project working on modifying the UM to write CF-NetCDF output || [wiki:Projects/FASCINATE FASCINATE] "Forecasting Air-Sea Coupled Interactions in Numerical weather prediction for Atmospheric Tropical Extremes"  || 
    2020||[wiki:Projects/ARCHER-UM-Module-Environment ARCHER UM Module Environment]  Design and implementation of UM modules for ARCHER to facilitate the management of software upgrades || || 
    21 || [wiki:Projects/NCAS-CSS NCAS Climate Summer School 2015] || [wiki:Projects/INCOMPASS INCOMPASS] NERC/MoES project to improve the skill of rainfall prediction in operational weather & climate models || 
     21|| || [wiki:Projects/INCOMPASS INCOMPASS] NERC/MoES project to improve the skill of rainfall prediction in operational weather & climate models || 
    2222|| [wiki:Projects/UKCA UKCA] United Kingdom Chemistry and Aerosols project ||  ||  
    2323|| [wiki:Projects/UKESM1 UKESM1] || || 
     
    4444=== 2017 === 
    4545 
    46 || '''Core Projects''' || 
    47 || [wiki:Projects/Monsoon2 Monsoon2] Monsoon upgrade to XCS || 
     46|| '''Core Projects''' || '''Funded Projects || 
     47|| [wiki:Projects/Monsoon2 Monsoon2] Monsoon upgrade to XCS || [wiki:Projects/IS-ENES2 IS-ENES2] (2013-17) The second !InfraStructure for the European Network for Earth System Simulation project. Funded for 51 months FTE (2013-17) || 
     48|| [wiki:Projects/NCAS-CSS NCAS Climate Summer School] || || 
    4849 
    4950=== 2016 ===